Specification
Capacity: 10t~1300t
Span: 18m ~30m
Lifting height: 24m~30m
Environment: Indoor, working duty A3~A5
An EOT crane consists of long traveling mechanism, cross traveling mechanism, hoist mechanism and electric equipment. The end of bridge structure is connected to the workshop structure or on the elevated tracks in the open yard through travelling mechanism.
Specification
Capacity: 10t~1300t
Span: 18m ~30m
Lifting height: 24m~30m
Environment: Indoor, working duty A3~A5
Tel.:+86-351-6364209,137****5956
Email:shilei@tz.com.cn
Application
EOT cranes are widely used in the hydropower station workshop, manufacturing shop, indoor warehouse, workshop, yard and open storage yard etc.
Features
Reference
Sl. No |
Capacity(t) |
Span(m) |
Delivery |
Client |
1 |
250/50/10t+250/50/10t |
-20m |
Sep. 2005 |
Henan Bao Quan pumped storage Co., Ltd |
2 |
800/160t |
-26m |
Sep. 2005 |
Xiao Wan |
3 |
800/160t |
-26m |
Sep. 2005 |
Xiao Wan |
4 |
800/160t-26m |
-26m |
Sep. 2005 |
Xiao Wan |
5 |
300/50t+300/50/10t |
-24m |
Aug. 2005 |
Heimifeng Power Station |
6 |
475t+475/16t |
-28.5m |
Jan. 2006 |
Tuoxi Hunan |
7 |
420t+420t |
-27m |
April 2005 |
Sichuan Daduhe |
8 |
475t+475/16t |
-28.5m |
Jan. 2006 |
Tuoxi Hunan |
9 |
420t+420t |
-27m |
April 2005 |
Sichuan Daduhe |
10 |
800/160t |
-29m |
Sep. 2006 |
Jin An Qiao |
11 |
800t |
-29m |
Oct. 2006 |
Jin An Qiao |
12 |
1400t |
-6m |
Oct. 2006 |
|
13 |
125/25t+125/25/5t |
-17m |
Nov. 2006 |
Yunnan Baoshan Binlangjiang Hydropower Development Co., Ltd |
14 |
250t+250t |
-22.5m |
March 2006 |
Tankeng Hydropower Station |
15 |
800/160/16t |
-29m |
Sep. 2006 |
Jin An Qiao |
16 |
300t+300/50/10t |
-22.5m |
Sep. 2007 |
Liaoning Pushihe Hydropower Station |
17 |
1200t+125t |
-29.5m |
April 2007 |
Three Gorges Underground Hydropower Station |
18 |
150/50t |
-25m |
Oct. 2007 |
Long Kou |
19 |
250t+250/50/10t |
-25m |
Oct. 2007 |
Long Kou |
20 |
1200t+125t |
-30.5m |
Jun 2008 |
Xiangjiaba Hydropower Station |
21 |
1000/100t |
-28m |
Jun 2008 |
Xi Luo Du |
22 |
25t |
-23.5m |
Feb.2008 |
POSCO, South Korea |
23 |
45t |
-14m |
May 2008 |
POSCO, South Korea |
24 |
800/160t |
-27m |
Sep.2008 |
Nuo Zha Du |
25 |
450t+450t |
-27.8m |
Oct. 2008 |
Guandi Hydropower Station |
26 |
550/150/10t |
-29m |
April 2008 |
Jishi Gorge Hydropower Station |
27 |
800t |
-27m |
Oct. 2008 |
Nuo Zha Du |
28 |
1000/100t |
-28m |
Oct. 2008 |
Nuo Zha Du |
29 |
1000/100t-28m |
-28m |
Oct. 2008 |
Nuo Zha Du |
30 |
550/150/10t |
-29m |
April 2008 |
Jishi Gorge Hydropower Station |
31 |
550/150/10t |
-29m |
April 2008 |
Jishi Gorge Hydropower Station |
32 |
550/150/10t |
-29m |
May 2008 |
Jishi Gorge Hydropower Station |
33 |
450t+450t |
-27.8m |
Oct. 2008 |
Guandi Hydropower Station |
34 |
450t+450t |
-27.8m |
Oct. 2008 |
Guandi Hydropower Station |
35 |
800/160t |
-26m |
Oct. 2008 |
Nuo Zha Du |
36 |
1200t+125t |
-35.5m |
Oct. 2009 |
Xiangjiaba Hydropower Station |
37 |
160/50t |
-34m |
Feb. 2009 |
Deyang Sichuan |
38 |
400t+400t |
-25.5m |
Oct. 2009 |
Pan Kou |
39 |
350/500t |
-22.5m |
Dec. 2009 |
Malaysia |
40 |
700/125t |
-28m |
Feb. 2009 |
Yunnan Jinsha River Hydropower Development Co., Ltd |
41 |
3000t |
-113m |
July 2010 |
China Three Gorges Projects Development Co., Ltd |
42 |
350/50t |
-22.5m |
Oct. 2009 |
Malaysia |
43 |
350/50t |
-22.5m |
Oct. 2009 |
Malaysia |
44 |
20t |
-15.4m |
Oct. 2010 |
China Three Gorges Corporation |
45 |
20t |
-13.98m |
Oct. 2010 |
China Three Gorges Corporation |
46 |
20t |
-14.4m |
Oct. 2010 |
China Three Gorges Corporation |
47 |
20t |
-14.4m |
Oct. 2010 |
China Three Gorges Corporation |
48 |
20t |
-14.4m |
Oct. 2010 |
China Three Gorges Corporation |
49 |
25t |
-23.55m |
March 2012 |
PT. Krakatau POSCO, Indonesia |
50 |
500t+500t |
-114.2m |
May 2012 |
China Three Gorges Corporation |
51 |
80/20t |
-29.1m |
May 2013 |
Iraq Salahattin |
52 |
80/20t |
-29.1m |
May 2013 |
Iraq Salahattin |
53 |
50/10t |
-7.5m |
Nov. 2011 |
Hunan Dongjiang Power Station |
54 |
50/10t |
-13.5m |
Feb. 2013 |
Iraq 2X630MW Fuel gas power station |
55 |
15t |
-15m |
Mar. 2013 |
Zhejiang Xianju hydropower station |
56 |
15t |
-18.5m |
Mar. 2013 |
Zhejiang Xianju hydropower station |
57 |
300/50/10t |
-23.5m |
Oct. 2012 |
Zhejiang Xianju |
58 |
550/150/10t+10t |
-20m |
Mar. 2015 |
Liu Jia Xia |
59 |
500/32/10t |
-23m |
Aug. 2015 |
Bai He Tan |
60 |
500/32t |
-23m |
Aug. 2015 |
Bai He Tan |
61 |
80/30t |
-24.8m |
May 2017 |
YalongJiang Hydropower Station |
62 |
45/6.3t |
-7.6m |
Nov. 2017 |
YalongJiang Hydropower Station |
63 |
550/100t+16t |
-24.8m |
Dec. 2017 |
Yalong River Hydropower Development Company Ltd |
64 |
550/100t+16t |
-24.8m |
Dec. 2017 |
Yalong River Hydropower Development Company Ltd |
65 |
550t+550t |
-24.8m |
Dec. 2017 |
Yalong River Hydropower Development Company Ltd |
Telephone:+86-351-6366223
Fax:+86-351-6360994
E-mail:info@tz.com.cn
Mobile version
Copyright © 1998-2019 Taiyuan Heavy Industry Co., Ltd. 晋ICP备05004298 晋公网安备 14010902000286号